ARCHITECTURE / MONTRÉAL

Client guide · fees and quotes

Understanding architectural fees

To understand a price, look at the work it covers. Here are the stages of a scope, the costs to separate and a completed comparison example. This helps you ask precise questions without confusing professional fees, construction and municipal charges.

What you commission at each stage

Fees pay for work and responsibility, not a page count. Ask: which decision can I make using the delivered documents? A survey, an options comparison and a detailed application address different needs.

The stages below are a reading aid, not a statement that every quote includes them all. A proposal identifies the selected stages, who performs them, deliverables, meetings and exclusions.

Read a service scope
StageResult to identifyQuestion to ask
SurveyExisting-condition information and observation limits.Which areas are documented and in what format?
Options studyChoices to compare before project development.Which criteria and decision should the document inform?
Design and drawingsRepresentation of the selected proposal.Are these permit documents, construction documents or both?
Communication and follow-upAgreed responses, coordination and interventions.Which meetings, revisions and visits are included?

Separate the fee method from the scope

A proposal should state its fee method and adjustment conditions. For a fixed fee, examine the covered services and assumptions. For time-based billing, ask about rates, time reporting and approval of additional work. If fees depend on construction cost, identify the calculation basis and how it is revised.

These are items to examine in a proposal, not fee methods advertised by Archidep. No standard price is published here: the firm must confirm the terms actually proposed for your file.

Two proposals can cover different work

Educational example without prices: proposals A and B address the same extension request. A covers the survey and permit documents; B also specifies a design stage and additional assistance. Reconcile the items and obtain missing information before comparing totals.

“Not specified” means neither “included” nor “unnecessary.” This table identifies questions, not a judgment about a real proposal. Use the comparison tool on this page to apply the same approach to your own offers.

Completed comparison example
ItemFictional proposal AFictional proposal B
SurveyAffected areas described.Affected areas described.
Design choicesStage needs clarification.Presentation of options stated.
Drawing purposePermit; construction detailing needs clarification.Permit and construction documents identified separately.
StructureEngineer’s involvement needs clarification.Separate engineering assignment mentioned.
RevisionsNumber and nature not stated.Revisions attached to a stage; review limits.
Municipal follow-upSubmission only in this example.Post-submission exchanges described; confirm the end of the assignment.

Prepare the budget and make an informed acceptance

Keep four costs visible: architectural services, other professionals, municipal charges and construction. Inclusion in the overall budget does not mean payment under the same contract. Taxes, expenses, possible travel and payment terms should be identifiable.

Before accepting, reconcile deliverables, exclusions, meetings and payment stages. For a scope change, keep a written description of the change and the agreement on additional services before the work is performed.

Questions and answers

Why is there no price per square metre?

Floor area does not describe available records, the intervention, checks, coordination or requested follow-up. Send the same brief and request a written scope to obtain comparable proposals. A construction cost per square metre is not a professional fee rate.

What should I ask if revisions are not detailed?

Ask to distinguish design adjustments, municipal comments and client-requested changes to the brief. Identify the relevant stages and how additional work is agreed. Revision counts cannot be inferred from the total price.

Does a permit refusal automatically mean a refund?

Services performed and the municipal decision are separate matters. Financial consequences depend on the contract and circumstances, not only the permit outcome. Keep the accepted proposal, delivered documents and written refusal to discuss next steps precisely; questions of legal rights require legal advice.

Compare architecture service proposals

Put two proposals side by side, with an optional third. Read the written scope before comparing fees: the same price may cover different services.

For each item, select included, excluded or needs clarification, then record the wording or questions to ask. For exclusions, specify which services are outside the scope.

Your entries are not sent to Archidep or saved automatically. They stay on this page: copy or export them before leaving or reloading.

1,000 characters maximum per note.

Scope of services

Covered phases, objectives and services.

Proposal A
Proposal B

Deliverables

Plans, documents, formats and intended use.

Proposal A
Proposal B

Exclusions

Services and fees explicitly outside the scope.

Proposal A
Proposal B

Meetings and revisions

Included meetings, revisions and additional changes.

Proposal A
Proposal B

Municipal submission

Preparation, submission and responses to the municipality.

Proposal A
Proposal B

Other professionals

Roles, appointments and fees of other professionals.

Proposal A
Proposal B

Fees and written terms

Fee basis, payments, taxes and expenses.

Proposal A
Proposal B

Schedule

Phases, dependencies and approval stages.

Proposal A
Proposal B

A comparison worksheet to prepare your questions; it does not replace the written proposal or agreement.

Further reading from the Ordre des architectes du Québec (in French): Service proposals: small commissions, important precautions.

Municipal requirements and fees depend on the building and work. Confirm the applicable rules with the relevant municipality.

The next step

Give your project a clear direction.

A renovation, an extension or a question from the municipality? Tell us about your situation and the documents you have.

Let’s discuss your project
Discuss your project