What you commission at each stage
Fees pay for work and responsibility, not a page count. Ask: which decision can I make using the delivered documents? A survey, an options comparison and a detailed application address different needs.
The stages below are a reading aid, not a statement that every quote includes them all. A proposal identifies the selected stages, who performs them, deliverables, meetings and exclusions.
| Stage | Result to identify | Question to ask |
|---|---|---|
| Survey | Existing-condition information and observation limits. | Which areas are documented and in what format? |
| Options study | Choices to compare before project development. | Which criteria and decision should the document inform? |
| Design and drawings | Representation of the selected proposal. | Are these permit documents, construction documents or both? |
| Communication and follow-up | Agreed responses, coordination and interventions. | Which meetings, revisions and visits are included? |
Separate the fee method from the scope
A proposal should state its fee method and adjustment conditions. For a fixed fee, examine the covered services and assumptions. For time-based billing, ask about rates, time reporting and approval of additional work. If fees depend on construction cost, identify the calculation basis and how it is revised.
These are items to examine in a proposal, not fee methods advertised by Archidep. No standard price is published here: the firm must confirm the terms actually proposed for your file.
Two proposals can cover different work
Educational example without prices: proposals A and B address the same extension request. A covers the survey and permit documents; B also specifies a design stage and additional assistance. Reconcile the items and obtain missing information before comparing totals.
“Not specified” means neither “included” nor “unnecessary.” This table identifies questions, not a judgment about a real proposal. Use the comparison tool on this page to apply the same approach to your own offers.
| Item | Fictional proposal A | Fictional proposal B |
|---|---|---|
| Survey | Affected areas described. | Affected areas described. |
| Design choices | Stage needs clarification. | Presentation of options stated. |
| Drawing purpose | Permit; construction detailing needs clarification. | Permit and construction documents identified separately. |
| Structure | Engineer’s involvement needs clarification. | Separate engineering assignment mentioned. |
| Revisions | Number and nature not stated. | Revisions attached to a stage; review limits. |
| Municipal follow-up | Submission only in this example. | Post-submission exchanges described; confirm the end of the assignment. |
Prepare the budget and make an informed acceptance
Keep four costs visible: architectural services, other professionals, municipal charges and construction. Inclusion in the overall budget does not mean payment under the same contract. Taxes, expenses, possible travel and payment terms should be identifiable.
Before accepting, reconcile deliverables, exclusions, meetings and payment stages. For a scope change, keep a written description of the change and the agreement on additional services before the work is performed.
Questions and answers
Why is there no price per square metre?
Floor area does not describe available records, the intervention, checks, coordination or requested follow-up. Send the same brief and request a written scope to obtain comparable proposals. A construction cost per square metre is not a professional fee rate.
What should I ask if revisions are not detailed?
Ask to distinguish design adjustments, municipal comments and client-requested changes to the brief. Identify the relevant stages and how additional work is agreed. Revision counts cannot be inferred from the total price.
Does a permit refusal automatically mean a refund?
Services performed and the municipal decision are separate matters. Financial consequences depend on the contract and circumstances, not only the permit outcome. Keep the accepted proposal, delivered documents and written refusal to discuss next steps precisely; questions of legal rights require legal advice.