Check application consistency before submission
A document checklist is not enough: the plan, elevations, form information and reference records need to describe the same project. Prepare an index containing title, date, revision and source. It helps establish what was reviewed if the City requests a correction.
Educational example: an elevation retains a window while the floor plan removes it. The issue is not a missing sheet; two representations conflict. A pre-submission review should identify such discrepancies. The following table illustrates reading checks, not certification of compliance.
| Information | Documents to compare | Discrepancy to identify |
|---|---|---|
| Address and reference | Application form and drawing title blocks. | A record refers to another file. |
| Existing and proposed | Plans, demolition and elevations. | An element changes on only one sheet. |
| Siting | Site plan and available reference record. | Boundaries or dimensions without an identified source. |
| Submitted version | Index and transmitted files. | An old revision is attached by mistake. |
Which drawings do you need: permit or construction?
Start by describing the work: an interior renovation, extension or change of use. The document checklist depends on the building and borough. Confirm the applicable requirements before defining the drawings and other documents to produce.
Obtaining a permit does not mean every detail needed for construction is included in the scope. The quote should state the purpose of the drawings and which construction documents are included. The Ordre des architectes du Québec also notes that a municipality may require construction drawings at the permit stage: check this before agreeing on the scope and fees.
Place the file: alteration, addition or occupancy
The same address can fall under different processes depending on the work: interior alteration, added volume, change of use, signage or exterior fit-out. Describing each intervention separately keeps one form from covering the project poorly.
Start with the exact address and a description of the work: from those two pieces of information, the applicable process and the document list take shape.
- Interior alteration: rooms, openings, facade
- Added volume: extension, second storey, garage
- Occupancy and activation: use, signage, exterior fit-out
The professionals to coordinate
Depending on the work, the file may involve engineering, surveys or other professionals. The quote should say who produces what, so that every item of the file has an identified owner.
The municipality — the borough in Montreal — reads the request, asks its questions and issues its decision. The requirements come from the address and the described work, not from a standard package.
From requirement review to submission
Once the file has been assessed, the preparation mandate follows its own order: review of the applicable requirement, production of the selected drawings, assembly of the items and preparation of the submission. Exchanges with the municipality are limited to what the mandate provides.
Once submitted, each requested revision is tied to the drawing or the information involved. A new drawing version without explanation makes follow-up difficult: keep the dated versions and the complete correspondence.
Preparing the items of the file
A concept drawing does not replace a submission-ready package: they are different documents, produced at different times and meant for different readers.
- Exact address, building type and description of the work
- Available drawings, photos and certificate of location
- Document list or written request from the municipality
- Requests, correspondence and deadlines already received
What the mandate includes and what stays separate
The mandate can cover the review of the applicable requirement, the production of drawings, the preparation of the submission items and the follow-up of comments. The quote indicates which of these stages are retained.
Separate: the permit fees set by the municipality, the work, the engineering drawings and, unless the mandate provides for them, later exchanges with the city. A complete file does not replace the municipal decision, which belongs to the competent authority.
Two schedules, never confused
The mandate has its schedule: drawing production, assembly of the submission, possible revisions. It depends on the available records and the scope, and is defined when the mandate is accepted.
The municipality has its own: submission, review, revision requests, decision. Those timelines belong to the authority and cannot be promised by the studio. A real deadline — a sale, a move — is shared at the first conversation.
Questions and answers
What is the location certificate used for?
It is a land surveyor’s document consisting of a report and plan about the property’s situation. When required, its version and relevance to current conditions need checking. It does not replace interior renovation drawings or project documents. Identify its date rather than presenting it as an up-to-date architectural survey.
How should comments after submission be handled?
Keep the complete message and submitted version. Connect each comment to a question, record or identified change; reference the drawing and revision in the response. A regulatory question and document request require different responses. The worksheet in our guide helps organize that tracking.