Permits: clear requirements, coherent file

Building permit drawings and applications in Montréal

Need drawings for a renovation, extension or building permit application in Montréal? Archidep works with you to define the documents required for the work, building and borough. The scope may include architectural drawings, organizing the municipal file and revision follow-up, as specified in the quote.

From existing conditions to a clear next step

  1. Document the existing space

    Gather available plans, measurements and photographs to establish a starting point.

  2. Compare the options

    Compare the proposed layout with existing conditions and identify what needs clarification.

  3. Assemble the application

    Bring together the relevant drawings and supporting documents for the applicable process.

Method diagram, not a completed project. The scope and documents depend on the project.

Check application consistency before submission

A document checklist is not enough: the plan, elevations, form information and reference records need to describe the same project. Prepare an index containing title, date, revision and source. It helps establish what was reviewed if the City requests a correction.

Educational example: an elevation retains a window while the floor plan removes it. The issue is not a missing sheet; two representations conflict. A pre-submission review should identify such discrepancies. The following table illustrates reading checks, not certification of compliance.

Cross-check examples
InformationDocuments to compareDiscrepancy to identify
Address and referenceApplication form and drawing title blocks.A record refers to another file.
Existing and proposedPlans, demolition and elevations.An element changes on only one sheet.
SitingSite plan and available reference record.Boundaries or dimensions without an identified source.
Submitted versionIndex and transmitted files.An old revision is attached by mistake.

Which drawings do you need: permit or construction?

Start by describing the work: an interior renovation, extension or change of use. The document checklist depends on the building and borough. Confirm the applicable requirements before defining the drawings and other documents to produce.

Obtaining a permit does not mean every detail needed for construction is included in the scope. The quote should state the purpose of the drawings and which construction documents are included. The Ordre des architectes du Québec also notes that a municipality may require construction drawings at the permit stage: check this before agreeing on the scope and fees.

Place the file: alteration, addition or occupancy

The same address can fall under different processes depending on the work: interior alteration, added volume, change of use, signage or exterior fit-out. Describing each intervention separately keeps one form from covering the project poorly.

Start with the exact address and a description of the work: from those two pieces of information, the applicable process and the document list take shape.

  • Interior alteration: rooms, openings, facade
  • Added volume: extension, second storey, garage
  • Occupancy and activation: use, signage, exterior fit-out

The professionals to coordinate

Depending on the work, the file may involve engineering, surveys or other professionals. The quote should say who produces what, so that every item of the file has an identified owner.

The municipality — the borough in Montreal — reads the request, asks its questions and issues its decision. The requirements come from the address and the described work, not from a standard package.

From requirement review to submission

Once the file has been assessed, the preparation mandate follows its own order: review of the applicable requirement, production of the selected drawings, assembly of the items and preparation of the submission. Exchanges with the municipality are limited to what the mandate provides.

Once submitted, each requested revision is tied to the drawing or the information involved. A new drawing version without explanation makes follow-up difficult: keep the dated versions and the complete correspondence.

Preparing the items of the file

A concept drawing does not replace a submission-ready package: they are different documents, produced at different times and meant for different readers.

  • Exact address, building type and description of the work
  • Available drawings, photos and certificate of location
  • Document list or written request from the municipality
  • Requests, correspondence and deadlines already received

What the mandate includes and what stays separate

The mandate can cover the review of the applicable requirement, the production of drawings, the preparation of the submission items and the follow-up of comments. The quote indicates which of these stages are retained.

Separate: the permit fees set by the municipality, the work, the engineering drawings and, unless the mandate provides for them, later exchanges with the city. A complete file does not replace the municipal decision, which belongs to the competent authority.

Two schedules, never confused

The mandate has its schedule: drawing production, assembly of the submission, possible revisions. It depends on the available records and the scope, and is defined when the mandate is accepted.

The municipality has its own: submission, review, revision requests, decision. Those timelines belong to the authority and cannot be promised by the studio. A real deadline — a sale, a move — is shared at the first conversation.

Questions and answers

What is the location certificate used for?

It is a land surveyor’s document consisting of a report and plan about the property’s situation. When required, its version and relevance to current conditions need checking. It does not replace interior renovation drawings or project documents. Identify its date rather than presenting it as an up-to-date architectural survey.

How should comments after submission be handled?

Keep the complete message and submitted version. Connect each comment to a question, record or identified change; reference the drawing and revision in the response. A regulatory question and document request require different responses. The worksheet in our guide helps organize that tracking.

Before commissioning work

Three points to clarify in your quote

When comparing proposals, ask for written answers to these questions. Project-specific terms are those set out in the accepted proposal.

What if the city refuses after I have paid for the services?

Archidep reviews feasibility and applicable requirements early to identify constraints before preparing the application. If the City later requests corrections or issues an unfavourable decision, first connect the reason to the submitted design: a missing record, design change and special approval need different responses. Included revisions and correspondence are defined in the contract; additional work is scoped separately. Payment covers agreed professional services and does not guarantee the municipal decision.

How long will the project take?

The schedule is established after reviewing the request: a targeted check, commercial premises application and major transformation require different production. It accounts for records to obtain, checks, drawing preparation and your approvals. Share deadlines at the first conversation. Urgent processing may be considered subject to availability, with an additional fee disclosed before commitment. Office production remains separate from City review and other contributors’ timing.

Are revisions included?

The service proposal includes provision for revisions. The contract specifies their number, scope and applicable stage. Distinguish an adjustment to the selected design, municipal comments and a new request changing the brief. Changes beyond the agreed scope should be defined before additional production. Retain approved decisions and drawing versions so each change can be identified.

OAQ: understanding a service proposal (French)

The next step

Give your project a clear direction.

A renovation, an extension or a question from the municipality? Tell us about your situation and the documents you have.

Let’s discuss your project
Discuss your project