ARCHITECTURE / MONTRÉAL

Longueuil · drawings and permit applications

Drawings for renovations and extensions in Longueuil

Longueuil’s municipal portal allows application submission and progress tracking. Before submitting, define the intervention, prepare a coordinated digital package and retain the transmitted version. Submitting an application is not the same as receiving a permit.

Organize a digital submission in Longueuil

The official page distinguishes cases eligible for online issuance under conditions from other applications requiring review. Submission method does not establish automatic approval or a project timeframe. Consult the work-type information and requests received in your file.

Educational example: a renovation and addition should not be reduced to “house work.” Name the interventions, identify supporting records and check the appropriate process. The City states that only one application per work type may be transmitted at a time.

Digital application check before sending
ElementRetainTracking purpose
ApplicationComplete description and reference.Connect correspondence to the correct file.
DrawingsIndex, date and revision for every sheet.Identify the records actually reviewed.
Transmission and paymentConfirmation and receipt when issued.Distinguish submission, payment and authorization.
CommentsComplete message and attachments.Prepare a response for each comment.

Residential addition: which documents should you prepare?

Longueuil’s simplified information sheet published in July 2025 lists, among other documents, a proposed site plan signed and sealed by a land surveyor, and scaled architectural drawings of affected floors and existing and proposed elevations. A power of attorney is required if the applicant is not the owner.

Before commissioning or submitting documents, check the current information sheet and rules with the City for your address and the precise work. Other requirements may apply, including for tree removal or a project subject to a PIIA; a simplified sheet does not replace review of the file.

To prepare the online entry, the July 2025 sheet identifies the category “construction et/ou rénovation résidentielle” and the request type “agrandissement d’un immeuble résidentiel”. It also specifies PDF documents of no more than 10 MB for the required records. Confirm these instructions and current file limits in the portal before submitting; an incomplete application can delay processing.

Classify the work before submitting

Describe the interventions separately: interior reconfiguration, opening, facade change, extension or change of use. Each intervention may have its own requirements; check with the City whether the work should be presented together or in separate applications, depending on its nature.

A precise classification helps identify the competent service and the form to use. It reduces the risk of an application being returned for following the wrong path, but does not replace checking the requirements with the City.

Read the technical sheet before drawing

A technical sheet summarizes the requirements specific to a type of work: documents to attach, information to provide, points to check. Reading it before design avoids producing drawings that do not answer the filing requirements.

Also note what the sheet does not cover for your building. These questions go to the competent service before submission, rather than after a revision request.

Documents useful to the file

The final list comes from the applicable sheet. The items below are enough for an initial review of the file and to spot what is missing before submission.

  • Description of the work, area by area
  • Photos of existing conditions and affected areas
  • Prior drawings and permits, if they exist
  • History of exchanges with the City
  • Points not covered by the technical sheet

Owner and professional responsibilities

Some information belongs to the owner: actual use, work already carried out, building history. Other items belong to the professional: surveys, drawings and compliance notes.

This split is settled before the quote. It prevents a missing item or a late answer from blocking an otherwise ready submission.

Follow the submission through to the decision

After submission, keep the acknowledgements and answer each clarification request with a dated response. A comment left without a documented answer delays the file.

Before work begins, confirm that the required authorizations have been obtained. A submitted application is not yet an authorization.

Questions and answers

Does submission confirmation mean I can start?

It records an application step, not necessarily authorization issuance. Check the received document, conditions and portal status. Keep submission confirmation, payment receipt and the issued permit separately.

The next step