ARCHITECTURE / MONTRÉAL

Define the right scope

Project coordination

Coordination reduces grey areas between design, municipality, engineering and construction.

Make each decision traceable

Coordination connects a question, the people who need to answer it and affected documents. A general calendar is insufficient where a decision lacks an assigned person or input information. Coordination scope, exchanges and meeting records are defined in the engagement.

Educational example: a new roof opening is contemplated for equipment. It affects the architectural drawing, equipment needs and related technical checks. A useful record identifies expected inputs and affected documents; it does not treat agreement in principle as approval by every discipline.

Decision register example

The following fictional table illustrates tracking; it does not define your construction project’s contractual organization. For each item, identify the actually assigned person and the document version incorporating the decision.

Worked coordination tracking example
QuestionExpected informationRecord to retain
Where should equipment go?Dimensions, maintenance access and requirements to communicate.Equipment sheet and location drawing.
How are drawings affected?Checks by the relevant disciplines.Identified sheets and revision indexes.
Who confirms the owner’s choice?Explicit choice among documented options.Dated decision and related assumptions.
What is transmitted next?List of the coordinated set to share.File index and recipients.

Distinguish roles before starting

Coordination, construction supervision, contractor management and each contributor’s obligations are not interchangeable. Before commissioning the service, identify covered phases, planned meetings or visits, tracking documents and limits.

Do not infer from meeting notes that every part of the work has been inspected. An observation should state its context and what was actually reviewed. Questions about contractual responsibility or legal obligations require appropriate professionals and project documents.

Prepare to resume existing coordination

Provide contributors and known scopes, the latest schedule, available meeting records, open decisions and drawing index. Identify versions used by different recipients. File differences should be identified before resuming tracking as if the file were uniform.

An initial review can distinguish confirmed decisions, open choices and missing external information. It helps define the work without promising recovery of a schedule whose dependencies are not all known.

Questions and answers

Does coordination include a permanent site presence?

A permanent site presence should not be inferred from the service name. The proposal should identify phases, visits, meetings and documents along with their purpose. Distinguish document coordination from actually agreed construction review or site services.

What belongs in a useful meeting record?

Identify date, participants, reviewed documents and decisions. Each open action should state the question, expected information, assigned contact and agreed deadline. Separate observations, owner choices and outstanding checks; discussion is not technical approval by every discipline.