ARCHITECTURE / MONTRÉAL

Practical guide

Permit refused: revision, variance or new design?

Connect a refusal to its exact reason before revising drawings. Start by distinguishing missing records, conflicting documents and regulatory questions. The examples below show how to prepare a readable response using the worksheet on this page.

Identify the document and project version reviewed

Keep the complete decision, cited provisions, submitted drawings and correspondence. Identify the authority and project version concerned. A request for additional information does not necessarily have the same scope as a reasoned refusal.

The first classification identifies useful work: supply a record, explain a discrepancy, revise the proposal or examine a legal route. A new submission should address the point received.

Three examples of organized responses

This educational table is not a response to an authority. The “open question” column is essential: it avoids presenting an intention or assumption as an accepted fact.

Completed examples to adapt in the worksheet
Fictional commentResponse to prepareRecord / open question
A requested record is missing.Identify the exact record and author; confirm the expected format.Document inventory; confirm availability and date.
Drawing and description show different proposals.Locate the discrepancy, revise the relevant version and explain the change.Dated drawing and description; check other affected records.
A regulatory provision is cited.Record the reference, examine the proposal against the reason and study possible adaptations.Review and revised option; confirm the available next process.

Choose between correction, adaptation and another process

A documentary correction addresses missing or inconsistent information. A design adaptation changes an option: volume, layout, material or another affected element. A special process must be examined against its conditions; it is not simply a redesigned application layout.

Minor variance conditions and exclusions are identified by Québec and municipal regulations. PIIA concerns integration criteria and a separate decision. Challenges and their deadlines require appropriate legal review; resubmission is not assumed to suspend them.

Assemble an understandable new version

Number comments and connect each to a response and document. Dates and revision references should identify the same information across drawings, description and supporting records. Retain the previous file separately.

Before sending, identify open questions and who handles them. The service proposal should define correction work, municipal correspondence and how a new scope is accepted when the project changes.

Questions and answers

Does a refusal mean no option remains?

Read the reason and scope of the decision. An option may need adaptation, checks or another eligible process; some constraints may also lead to abandoning it. The conclusion follows that review, not the word “refusal” alone.

Who should answer comments?

Identify comments concerning drawings, owner records and other professionals. Agree on a coordinating contact and check that the assignment includes this work. One shared list helps avoid conflicting responses.

Can we resubmit exactly the same drawings?

A useful response explains how each reason is addressed. The same drawings may not suffice where revisions are requested; in another case, an additional record or explanation may be the actual need. Identify the expected change before resubmission.

A tool to organize your file

Connect each comment to a response and a document.

Record the comment as received, then separate the proposed response from unresolved questions. The document version helps everyone find the same information after a revision.

Your notes stay in this tab: nothing is submitted or saved automatically. Copy or download your worksheet before closing or reloading the page.

Comment 1
Comment 2

Download the blank template, including without JavaScript

Preparation aid only: this worksheet is not an official response, legal remedy, technical study or authorization. It does not suspend any deadline.

Municipal requirements and fees depend on the building and work. Confirm the applicable rules with the relevant municipality.