Design + PIIAChateauguay

Second storey: making design answer the PIIA

A second-storey addition and garage had to integrate with the building.

01

The problem

A second-storey addition and garage had to integrate with the building.

02

The constraint

The CCU assessed massing, materials and integration.

03

Our strategy

Test several massing options and connect choices to criteria.

04

Documented outcome

The design became a reasoned regulatory submission.

Documents produced

  • Massing
  • Elevations
  • PIIA rationale