Commercial regularizationMercier–Hochelaga-Maisonneuve
Undeclared commercial fit-out
A fit-out completed without a permit had to be documented.
01
The problem
A fit-out completed without a permit had to be documented.
02
The constraint
Existing conditions, use and borough requirements had to align.
03
Our strategy
Survey, identify gaps and structure the file.
04
Documented outcome
The file was converted into verifiable steps.
Documents produced
- Survey
- Regularization drawings
- Corrections
Next decision
Request the diagnostic. We clarify the realistic path.
Municipality, issue and deadline are enough to start triage. A quote always comes before payment.